en
cz
Power engineering
Published: 9/14/2017

Heat pumps, Česká Lípa

Heat pumps, Česká Lípa There is now 20 heating sources installed in Česká Lípa, with heat pumps and gas boilers with output power of about 100 kW, more coming soon.

The control systems are connected through a network and connected to a central management station together with remote energy metering readouts, so that the manager can benchmark the efficiency of the power sources with forecast as well as between each other. The system is extendable with no more requirements on the IT infrastructure of the central management station.


More district heating references:

  • Liberec – heating of blocks of flats using heat pumps.
  • TPP Pardubice – control of heating / cooling source, the largest CEE installation of heat pumps.